Small Wind Generator Impaired Products Electronic  Security  System
 Home  |  Profile  | Products | Press Release | Brochure | Our Strength | Achievements | SWG Inquiry Forms | Contact us
 
Download Brochure
Solar Wind Hybrid System
Security Alarm System
NANO Wind Solar Hybrid System
Wood Stove & Solar Lanten
Mobile Solar Aerator
CCTV and DVR
 
Press Release
The Sunday
Times of India
 
More...
 
  Patented Technology
 
 
 
 
 
 
 
 
Name & Address of the Organization with the name of Contact Person and Telephone No: (Fields with the sign * are compolusary)
     

* Name of the Organization:

 
* Address :  
* Name of Contact Person at site:  

* Phone No:

 
* Email Address :  
     
Detailed Address of the site of installation of Small Wind Generator and contact person at the site with phone no.
     

Address of the site of the installation:

 

Name of contact person at the site:

 

Phone No:

 
 
Nearest Known Railway-station/ state transport station
   
     
Available means of transport
   
     
Availability of Grid Power at installation site

Grid Power available?

  YES    NO
If Yes; please specify    
Less than 3 hours/day 3 to 7 hour's/day
7 to12 hrs./day 12 to 20 hrs./day More than 20 Hrs./day
     
Average Wind Speed available at your site
Less than 7kmph 7kmph to 10kmph 10kmph to 15kmph
15kmph to 20kmph/day Above 20kmph
     
Present Power consumption per month in Units (Pl.attach Xerox copy of last Electricity Bill)
   
     
Expected Electric load from wind Generator in watts
  Tube lights Fans

Other Appliances
(Pl. Specify)

Nos.

Utilization Hours.(Average)
     
Whether Site of installation has concrete terrace?

YES    NO     

If Yes, specify height of the terrace. (in feet from the ground level)
   
     
Particulars of surrounding area

Height of Tress and Buildings (in feet)

Less then 10 feet 10 feet to 20 feet 20 feet to 30 feet
30 feet to 40 feet area More than 40 feet
     
Category of Installation
Residential Agricultural Industrial Hilly Area
Near sea Shore Near Electricity High Tension Line
     
Name and Designation of order finalization Authority
   
     
Facility for lodging & boarding along with local convince at site
   
     
      
     
All rights reserved by supernova.net 2008-2009   Developed @ G3Webmall